|
| |
(follow hyperlinks for more details)
| Role |
|
| Duties and Responsibilities |
- Reporting to Enterprise Systems Manager.
- Required to produce a “standard build” and documentation for Windows
2000/2003 server builds.
- Required to build a number of stand-alone and rack-mounted servers for special projects.
- Required to provide consultancy and technical support to NT team.
- Required to assist with implementation of Veritas NetBackup
across dedicated gigabit network.
- Monitor requests for change and trouble tickets assigned
through Remedy help desk system.
|
| Achievements |
- Conducted a security survey of all
managed NT servers, produced report detailing weaknesses, and
method to implement security patches and fixes.
- Built new Win2003 servers to standard,
including MS SQL and bespoke installations.
- Modified and upgraded installed server farm to standard.
- Implemented corporate network time synchronisation.
- Investigated and repaired failing Arcserve installations to
achieve 100% successful nightly backups.
- Devised backup reporting method via SNMP.
- Recovered crashed servers using rebuild/restore.
- Devised, installed, tested and documented installation of VERITAS
NetBackup to Windows servers, including SQL and Notes client
agents
- Installed and configured firewalled Secure
Encrypted E-mail system
- General troubleshooting of server problems.
|

Plaza 1, Ironmasters Way, Telford, Shropshire
International outsourcing company providing IT services to
large blue-chip organisations and government departments. Project to upgrade and
standardise network infrastructure across all departments, and to provide single
sign-on security.
| Role |
- Consultant / Implementation Team Leader
|
| Duties and Responsibilities |
- Reporting to Resource Manager.
- Required to act as Team Leader to upgrade teams
- Provide consultancy, technical support and leadership to upgrade team.
- Liaise and negotiate with local office managers and IT support officers.
- Build and install HP(Compaq) and Dell rack servers.
- Ensure all workstations receive appropriate
applications, printing access, and personal and group file access
rights. Delivered by Radia and utilising LDAP for active directory
look-up.
|
| Achievements |
- Distributed tasks to appropriate team members.
- Provided support to team as required.
- Migrated user data to new server.
- Documented and reported progress and issues.
- Diagnosed and resolved local implementation issues.
- Cleared outstanding issues during follow-up visits to post-rollout sites.
- Achieved 100% sign-offs
|

Department of Works & Pensions (Platform Standardisation Project)
Apex Centre, Leeds, West Yorkshire
Metropolitan Local Government Authority providing IT services
to approximately 8000 users, located in large central sites and smaller regional
offices such as Maintenance Depots and One Stop Shops. IT budgets are a
combination of Departmental spend, and central IT Services. Eight discrete
projects, ranging in length from 3 -15 months.
IT Services Department (Server Standardisation Project)
| Role |
|
| Duties and Responsibilities |
- Reporting to PC-LAN Manager.
- Required to provide consultancy and technical support
to upgrade team.
|
| Achievements |
- Able to bring technical experience and detailed
knowledge of the Council’s business requirements, leading to a very
smooth and successful standardisation of 120 Netware 4 servers in
preparation for upgrade to Netware 5/6. Applied fine-tuning techniques
to the documented upgrade process which resulted in highly stable and
standardised servers
|
IT Services (Backup and Disaster Recovery Upgrade Project)
|
Role |
|
|
Duties and Responsibilities |
- Reporting to IT Services Manager.
- Required to isolate a suitable product to upgrade the
corporate PC-LAN server backup to reduce risk and improve the
effectiveness of backup and disaster recovery
|
|
Achievements |
- Produced a report detailing the difficulties support personnel were
experiencing with Arcserve 6 and deficiencies in the corporate backup
policy. Evaluated, reported and advised on industry leading backup
products. Devised, detailed and documented an implementation of 150
server, city-wide rollout of Yosemite TapeWare. Created technical
support and user documentation. Diagnosed bedding-in issues, modified
methodology and established work-arounds as required. Trained and
handed on to permanent staff for completion. Continued to provide
consultancy as required
|
IT Services (Netware SFTIII Upgrade Project)
|
Role |
|
|
Duties and Responsibilities |
- Reporting to IT Services Manager.
- Required to manage a project, which was initially
intended to stabilise 12 central corporate SFT111 servers. During this
period the decision was taken to roll out a combination of Netware 5
and 6, thereby dictating that these servers be downgraded to native
NW4.11 prior to upgrade.
|
|
Achievements |
- Developed resilient specification for central
departmental server hardware to replace mirrored SFTIII. Negotiated
budgetary approval from individual departments for IT spend. Used MS
Project to establish a project timeline, plan equipment and human
resources and track progress. Created working documentation, and
trained staff to carry out server builds and replacements. Reported
progress to IT Services Manager.
|
IT Services (Server Support)
|
Role |
- Team Leader (deputising for permanent staff)
|
|
Duties and Responsibilities |
- Reporting to PC-LAN Manager
- Required to carry out all the routine tasks of
support team management
|
|
Achievements |
- Established a job prioritisation scheme. Reduced call
backlog by targeting ‘sticky’ jobs and assigning appropriate
staff. Brought call resolution times within SLA. Negotiated new call
handling procedures to improve effectiveness. Analysed and reported on
inappropriate data access levels for support staff. Revised
departmental security strategy to correct flaws in data access rights.
Wrote a report highlighting a number of unsecured access points for
malicious virus threats, and changes required to routine procedures to
improve data security. Trained and mentored staff.
|
Department of Training
|
Role |
|
|
Duties and Responsibilities |
- Reporting to IT Manager
- Required to install four discrete training networks
|
|
Achievements |
- Adjusted existing NW4 "NDS and Security
Standards Document" to include changes and additions specific to
Netware 5. Successfully configured and installed four Netware 5.1
servers, and training environments, ranging from 15 to 120 users,
utilising Compaq servers, Compaq PCs, and Apple Macs. Utilised
ZENworks and Windows policies to protect desktops, server and data
against accidental and malicious alteration. Trained permanent staff
to administer and operate network and NDS.
|
Leeds Learning Network (Schools Internet Connection Project)
|
Role |
|
|
Duties and responsibilities |
- Reporting to Project Manager.
- As part of the government initiative to provide
Internet access to schools. To carry out site surveys in schools
within the Leeds LEA in preparation for installation of managed ISDN
routers and Internet software
|
|
Achievements |
- Arranged visits to listed schools, meeting with Head
Teachers and ICT Co-ordinators in order to locate, and evaluate the
existing IT infrastructure and suitability of Windows NT4 servers and
workstations. Resolved IP configuration issues as required. Gathered
lists of pupils and staff from which to generate secure logins.
Created reports on each school providing special instructions to the
installation teams. Wrote letters to each school, highlighting any
pre-installation works, and providing quotes for work and materials as
appropriate. Diagnosed and resolved any issues arising following
Internet installation.
|
Department of Training
|
Role |
|
|
Duties and Responsibilities |
- Reporting to Departmental IT Manager.
- Required to install a new training network
- Required to define a "Network Standards
Document" for use at all training sites across the city
|
|
Achievements |
- Created NDS tree and Security Standards Document.
Designed a "model network infrastructure" for use in LCC
training environments. Configured and installed a Netware 4.11 server
and training PCs. Utilised ZENworks and Windows policies to protect
desktops and server against accidental and malicious alteration.
Configured Sophos Anti-virus to provide a ring-fenced data solution.
Reviewed existing firewall configuration to ensure controlled Internet
access for training research and protection of departmental data.
Resolved general problems on all existing training networks. Consulted
on an extension of Project 2000 (see below) to Department of training
staff network
|
IT Services - Project 2000
|
Role |
|
|
Duties and Responsibilities |
- Reporting to Project Team Leader.
- Required to build Compaq fileservers and transfer
user data from existing Netware 3 installations
|
|
Achievements |
- Configured and installed 23x Compaq Proliant 1600 and
9x Proliant 6000 fileservers, including RAID and SFTIII. Installed and
configured Managewise, Arcserve and Inoculan. Successfully backed up
and transferred user data from old servers. Liaised with Comms Team to
resolve WAN/router conflicts Designed, documented and implemented a
corporate Arcserve rotation schedule. Consulted with print, desktop
teams, and customers on server related issues.
|

Lowfields Road, Leeds, West Yorkshire
Part of the Lynx Group. National software and hardware
distributor, and provider of IT training services. WAN connections to two
regional and three Leeds sites.
Year 2000 Project
|
Role |
|
|
Duties and Responsibilities |
- Reporting to IT Manager.
- Required to manage the corporate Year 2000 desktop
project, reporting to the Board and ensuring that the century
transition did not impact the company’s ability to continue trading.
|
|
Achievements |
- Audited and documented existing company IT
infrastructure. Planned and scheduled tasks and milestones using MS
Project, monitored progress through to successful conclusion. Collated
manufacturer hardware and software compliance statements. Analysed
routine processes in order to minimize business risks. Proved and
documented test procedures and remedial actions. Monitored software
vendors for latest news on compliance. Advised on correct software
versions and date configurations. Y2K had zero impact on the company.
|
Server Replacement Project
|
Role |
|
|
Duties and Responsibilities |
- Reporting to IT Manager.
- Required to produce a strategy, and to replace
existing IT provision in line with business requirements.
|
|
Achievements |
- Provided an analysis of requirement and suggested
solutions for infrastructure upgrade and alignment. Installed Novell 4
server and client workstations. Designed and configured a secure and
effective IT environment geared to Sales and Marketing. Migrated
Banyan users and data to new infrastructure. Installed and configured
remote print-servers and queues. Installed and configured Backup Exec
to multiple servers. Standardized, stabilized and secured the network
environment across multiple sites, and documented accordingly.
Seamlessly redesigned NDS tree to reflect corporate structure.
|

Norgas House, Killingworth, Tyne-and-Wear
National gas pipeline manager. WAN connections to over 60
regional depots, each with 50-60 staff.
Netware 4 and Windows NT4 Upgrade Project
|
Role |
|
|
Duties and Responsibilities |
- Reporting to Divisional Team Leader.
- Required to participate in the ongoing support of
existing Netware 3/Windows 3 environment.
- Required to assist with the upgrade to Netware
4/Windows NT4 at multiple Transco sites across Scotland and Northern
England.
|
|
Achievements |
- Installed and configured Netware 4.11 fileservers.
Installed and configured Windows NT workstations. Configured
application delivery using ZENworks. Configured and troubleshot
Arcserve backup.
|

Wilton Site, Middlesbrough, Cleveland
IBM operating as outsourced IT provider to the 5000 user ICI
Headquarters, and 3000 user Runcorn division.
Server Rationalisation Project
|
Role |
|
|
Duties and Responsibilities |
- Reporting to IBM Project Manager.
- Required to participate with, and act as liaison
officer between, remote IBM project team and ICI Headquarters staff.
|
|
Achievements |
- Produced a report highlighting the business need, and
appropriate security measures to protect commercial confidentiality.
Participated in the development of "Standard" hardware and
software configuration. Participated in the testing and documentation
of a method for auto upgrade of clients. Specific responsibility to
specify and document the hardware and software for a Site Backup and
Disaster Recovery Plan.
|

Prestwick, Scotland
Jetstream Aircraft Division, building civilian aircraft
components in collusion with Toulouse, France. Approximately 300 workstations
spread across 12 hangars and offices, LAN and WAN connections to other Aerospace
sites throughout Britain.
|
Role |
|
|
Duties and Responsibilities |
- Reporting to Desktop Services Manager.
- Required to assess, recommend improvements to, and
action an overall site IT infrastructure upgrade. Numerous minor
niggles were contributing to a loss of confidence in the outsourced IT
contract (CSC). Inexperience had led to ineffective security and
working practises were contributing to the business risk.
|
|
Achievements |
- Audited the site infrastructure, and compiled reports
incorporating: upgrade recommendations, recommended modifications,
security improvements, standard desktop environment, and standard file
server installation. Improved the site Netware 4.1 installations to
the standards defined above. Created new NDS from scratch and
transferred existing users to new structure with full cognisance of
business requirements. Trained permanent network administrators in
Netware 4 (from v3) and transferred responsibilities and routines.
Continued in advisory role. Conducted a ‘one-year-on’ audit of the
Novell installation and its use across all business units. Compiled
reports for each business unit and overall site, identifying potential
zero cost improvements in efficiency and effectiveness.
|
|
Role |
- Lotus Notes Consultant / Developer
|
|
Duties and Responsibilties |
- Reporting to Professional Services Manager.
- Required to demonstrate how Lotus Notes could benefit
Divisional efficiency and reduce reliance on complex paper-based
methods. Methodology had to fit within stringent CAA regulations for
the supply of aircraft components.
|
|
Achievements |
- Advised on methods to incorporate Lotus Notes into
routine tasks of computer service department, and to use this to
demonstrate its potential to Aerospace management. Responsible for
delivery of a project to provide account managers across the UK with
industry news, project progress information and other miscellaneous
company information. Developed prototype databases, forms and views to
handle the above. Enabled significant operational efficiencies to be
made within the computer department problem handling procedures.
Convinced senior Aerospace managers that Notes could provide the
required ‘guaranteed signatory authority’ for component plans and
modifications.
|
|
Role |
|
|
Duties and Responsibilities |
- Reporting to Desktop Services Manager.
- To resolve the persistent corruptions in the customer’s
cc:Mail post offices, and to prepare for and liaise with the HP
OpenMail integration team.
|
|
Achievements |
- Diagnosed problems with disparate versions of
cc:Mail, and inconsistencies in user accounts. Deleted and re-created
inconsistent and corrupt user accounts, importing existing email to
the new accounts. Modified all usernames to enable a smooth
integration with the corporate HP OpenMail project. Liaised with the
OpenMail team to resolve client issues raised following successful
integration.
|

Darlington, Co. Durham
Computer Department Chief Technician (Technical Manager)
Bowburn, Co. Durham
Electronics and Computing Instructor
Previous employment history includes a number of years in the electronics servicing
industry, and 8 years service in the Royal Navy.
|